Matthieu Van Damme

Offshore Wind Transport & Installation and Interface Manager · Freelance

Foundations · Offshore substations · Inter-array cables
Belgium-based, available for international assignments

Profile

Profile

Freelance offshore wind T&I and interface manager (VMAT BV) combining contractor-side delivery experience at Jan De Nul Group with owner-side package management for Les Éoliennes en Mer. I cover foundations (monopile, jacket, pin piles), offshore substations and inter-array cables, from installation engineering and operational readiness through offshore execution as superintendent.

7+ years offshore wind T&IContractor side at Jan De Nul (2019–2024), owner side at Les Éoliennes en Mer (2024–present)
6 offshore wind farmsThor, Borkum Riffgrund 3 & Gode Wind 3, Formosa 2, TPC Phase 1, Îles d'Yeu et de Noirmoutier, Dieppe Le Tréport
FOU · OSS · IACMonopile and jacket foundations, pin piles, substations, inter-array cables, scour protection
Contracts & interfacesFIDIC, EPCI and multi-contracting; BIMCO charter parties; interface management between packages
Offshore-readyFull GWO, HUET CA-EBS, OGUK and STCW medical, VCA-VOL
Dutch · English · FrenchNative Dutch, fluent English and French; basic German, beginner Japanese
Map of offshore wind projects: Thor (Denmark), Borkum Riffgrund 3 and Gode Wind 3 (Germany), Dieppe Le Tréport and Îles d'Yeu et de Noirmoutier (France), Formosa 2 and TPC Phase 1 (Taiwan) Aalter (base) Thor OWFBorkum Riffgrund 3 / Gode Wind 3Îles d'Yeu et de NoirmoutierDieppe Le Tréport Formosa 2TPC Phase 1Taiwan

Expertise

Offshore wind T&I

  • Monopile foundations
  • Jacket foundations
  • Pin piles & pile driving
  • Grouting
  • Scour protection
  • Offshore substations (OSS)
  • Inter-array cables (IAC)

Operational readiness & execution

  • Cable laying & pull-ins
  • Trenching
  • Termination & testing
  • Heavy-lift installation
  • Superintendent duties
  • Permit to work

Interfaces & contracts

  • Package interfaces (FOU, WTG, OSS, Grid, IAC)
  • Marine warranty surveyors & authorities
  • FIDIC
  • EPCI & multi-contracting
  • BIMCO charter parties
  • Tendering & negotiation
  • Vessel selection & chartering

Installation documentation

  • Method statements
  • Risk assessments
  • Lift plans
  • Installation procedures
  • Readiness reviews

Experience

  1. IAC Interface & Operations Manager

    Dec 2025 – present

    Les Éoliennes en Mer Services (Ocean Winds / Sumitomo Corporation project company), via VMAT BV · Paris, France

    Îles d'Yeu et de Noirmoutier OWF · Dieppe Le Tréport OWF

    • Owner's single point of contact for all interfaces between the Inter-Array Cable (IAC) package, procured as a single EPCI contract, and the Foundations (FOU), Wind Turbine Generator (WTG), Offshore Substation (OSS), Grid and CONS packages across two offshore wind farms.
    • Drive owner-side operational readiness for the IAC Transport & Installation (T&I) phase: cable laying, end pull-ins, trenching, scour protection and termination & testing (T&T).
    More
    • Review contractor installation documentation (method statements, risk assessments, installation procedures) and track interface deliverables, actions and risks in line with project HSE requirements.
    • Procurement and contracts for the IAC stabilisation scopes: drafted and negotiated a BIMCO charter party with N-Sea for the vessel EDT Protea (temporary stabilisation, rock bag installation), including vessel selection; now tendering, drafting and negotiating the rock bag removal contract and the permanent stabilisation (rock berm) installation contract.
    • Operate within a multinational owner's organisation (Ocean Winds / Sumitomo Corporation joint venture) alongside French, European and Japanese stakeholders.
  2. OSS Transport & Installation Manager

    Aug 2024 – Nov 2025

    Les Éoliennes en Mer Services, via VMAT BV · Paris, France

    Îles d'Yeu et de Noirmoutier OWF · Dieppe Le Tréport OWF

    • Owner's T&I manager for the Offshore Substation (OSS) packages of two offshore wind farms: pre-piled jacket foundation at Îles d'Yeu et de Noirmoutier and post-piled jacket foundation at Dieppe Le Tréport.
    • Managed the OSS T&I contracts post-FID on behalf of the owner under a multi-contracting strategy (not EPCI): jacket fabricator Navantia, topside fabricator Chantiers de l'Atlantique and installation contractor DEME. Contractor performance monitoring, schedule and readiness reviews, approval of method statements, risk assessments and lift plans.
    More
    • Foundation scope covered pin pile installation, pile driving and grouted jacket connections for both pre-piled and post-piled configurations, followed by topside installation.
    • Tendered, negotiated and drafted the contract for OSS scour protection installation.
    • Managed interfaces between the OSS fabricators, the installation contractor, the electrical and foundation packages, the marine warranty surveyor and authorities.
  3. Senior Project Engineer & Superintendent – Offshore Renewables T&I

    Sep 2019 – Aug 2024

    Jan De Nul Group · Brussels, Belgium and offshore

    Thor OWF (RWE, Denmark) · Borkum Riffgrund 3 & Gode Wind 3 OWF (Ørsted, Germany) · TPC Changhua Phase 1 OWF (Taipower, Taiwan, 2020) · Formosa 2 OWF (Taiwan, 2022)

    • Thor OWF (RWE, Denmark): monopile (MP) foundation T&I – installation engineering and execution preparation for RWE's offshore wind farm in the Danish North Sea.
    • Borkum Riffgrund 3 & Gode Wind 3 OWF (Ørsted, Germany): monopile foundation T&I from marshalling port operations through offshore installation and handover.
    • Formosa 2 OWF (Taiwan): pre-piled jacket foundation T&I – 47 jackets and 188 pin piles: pin pile installation, pile driving and jacket installation with grouted connections, from the marshalling port in Taichung to offshore installation in the Taiwan Strait.
    • TPC Offshore Wind Farm Phase 1 (Taiwan Power Company, Changhua, Taiwan): onshore logistics for the pre-piled jacket foundation T&I scope as project engineer – marshalling port and yard operations.
    More
    • Offshore superintendent on heavy-lift installation vessels, supervising installation operations and contractor and subcontractor crews in compliance with HSE and permit to work systems.
    • Prepared and reviewed method statements, risk assessments, lift plans and installation procedures; interfaced with developer (client) teams, marine warranty surveyors, fabricators and port authorities.
    • Worked in multinational project teams across Denmark, Germany, Taiwan and Belgium.
  4. Project Finance Analyst – Energy Sector

    Sep 2017 – Aug 2019

    KPMG · Brussels, Belgium

    • Financial modelling and transaction advisory for energy infrastructure projects.
    • Supported due diligence and project finance structuring for energy-sector clients.
  5. Investment Banking Intern

    Sep 2016 – Sep 2017

    BNP Paribas CIB · Brussels, Belgium

    • Financial analysis and transaction support within corporate and investment banking.

Certifications & education

Certifications

  • GWO Basic Safety Training – full module set, incl. Working at Heights and Sea Survival (Global Wind Organisation)
  • HUET with CA-EBS (Helicopter Underwater Escape Training)
  • OGUK Offshore Medical and STCW Medical
  • VCA-VOL – Operationeel Leidinggevenden (safety certificate for operational supervisors)
  • B0/H0/H0V electrical safety habilitation (NF C18-510, France)
  • Chester Step Test
  • PMP – Project Management Professional (PMI): in preparation, exam expected end of November 2026

Education

  • MSc Mechanical Engineering, option Aerospace EngineeringKU Leuven · 2015
  • Advanced Master of Financial Markets, Magna Cum LaudeSolvay Brussels School of Economics and Management · 2017
  • CFA Level 1 (passed, 90th percentile)CFA Institute · 2019

Languages

  • Dutch – native
  • English – fluent
  • French – fluent
  • German – basic
  • Japanese – beginner

Contact

Available for owner-side and contractor-side T&I, package and interface management assignments in offshore wind, worldwide. Freelance through VMAT BV.

VMAT BV · Aalter, Belgium · Print this page